CASE STUDIES

ATS are very proud of the diverse projects we have completed.

Why not check out the details of our award winning work? 

 

2019 Melbourne Grammar School – Standby Generator - Student Boarding House

Working over the Christmas break, this installation was completed with no distruption to the school or its students. Collaboration with suppliers, the industry and the client resulted in an outstanding project that delivered all key outcomes for all stake holders.

 

2018 Melbourne Grammar School – Main Switchboard Upgrade – Grimwade Campus

Working closely with MGS and their design consultants, ATS implemented a solution that delivered significant cost savings from the original design, whilst maintaining supply and continuity. 

 

2013 Melbourne Grammar School - School Guardian Project

ATS was engaged by MGS to develop, design and install a customised audible evacuation and lockdown system that would safely manage the movement of staff and children onsite in the event of a crisis…

 

2012 Melbourne Grammar School - Lote Drama Project

ATS were the electrical sub-contractor to Buxton Constructions as the winning tenderer for this project.   The project involved the internal refurbishment of the upper level of four interconnecting heritage buildings to become a new LOTE (Language other than English) Centre and Drama teaching facility…

 

2011 ESV - Victorian Bushfire Power Line Safety Trials

In response to the 2009 Bushfires Royal Commission, the Victorian Government established a Taskforce to examine all options to minimise future risk…

 

2010 Willow - Mains and Automation Upgrade

Willow initially asked ATS to offer recommendations and quotation for a proposed upgrade of their conveyor system.   During these discussions, it was identified additional power supply would be required to facilitate any conveyor upgrade…

 

2009 Linfox HQ - Fire Detection & Suppression

ATS was requested to submit a price to JJA Consulting for the installation of the Fire Detection & Suppression System at Linfox’s new head office located in Essendon Fields…. 

 

2008 Box Hill Hospital - Mental Health Inpatient Unit

This hospital has capacity for 12 adolescent patients up to 18 years of age.   It is designed not to look like a hospital however has all the facilities you would expect in a hospital…

 

2008 Monash University - Gippsland Medical School - Churchill Campus

This hospital has capacity for 12 adolescent patients up to 18 years of age.   It is designed not to look like a hospital however has all the facilities you would expect in a hospital…

 

2006 Hallmark Cards - Carton Distribution Engineering Solution

ATS were first invited to Hallmark Cards to assist with the integration of their barcode reading equipment into a new carton conveying system...  

 

2005 Holden Limited Busway Installation

Holden’s existing Dynamometer and Wind Tunnel test facilities could not undertakel the required testing on the new V8 engine due to its capacity.  As a result major upgrade works were implemented...

 

2005 Melbourne Grammar School - Memorial Hall Project

Following the success of the Power Reticulation Project (the first stage in the complex Memorial Hall refurbishments) ATS was invited to tender for the electrical works for this project…

 

2004 Mahle - ACL Dynamometer Facilities Relocation Project

 The dynamometer facility relocation for Mahle-ACL consisted of the disassembly of the workshop electrical systems, Dynamometer Cell controls, fire systems and associated plant (Chiller & Cooling systems) at the Maidstone facility..

 

2003 Bluescope Steel - Plant Relocation Project.

BHP Steel Lysaght operations had been located in Nunawading for 25 years up to March 2003.   Having outgrown the facility, a new purpose built premise with concrete floor suitable for the installation of heavy machinery and equipment was constructed at Lyndhurst…

 

2002 Melbourne Grammar School - Power Reticulation Project

Working in conjunction with consulting engineers, ATS was engaged to complete the MGS Power Reticulation project over a period of 6 weeks during the 2002/3 summer school holidays...

 

For further info on these projects call us on 1300 287 000!